







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterTub-to-Shower Conversion in Westminster, CA
A tub-to-shower conversion in Westminster typically runs $3,800 to $9,500 for the full job, including demolition, waterproofing, tile, drain relocation, and a new shower valve. Most conversions take three to six working days once the materials are on site. It’s the single most common bathroom change we quote for homeowners in this city, and it’s the one where the details behind the wall matter more than the finish you pick at the showroom.
We’re Bradford Remodeling Co Westminster, and tub-to-shower work is a core part of our Bathroom Remodeling service. You get a written price before any work starts, background-checked and uniformed technicians, and a live person on the phone at (833) 954-5086 whenever you call. Every conversion we complete carries the 365-Day Done Right Promise: if the work fails inside a full year, we come back and correct it at no charge.

Key Takeaways
- Typical Westminster tub-to-shower conversion: $3,800 to $9,500, including waterproofing and drain work.
- Most jobs finish in three to six working days once materials arrive.
- You get a written price before the first tool comes out. No numbers that move at the door.
- Every job is backed by the 365-Day Done Right Promise.
- Our technicians have up to 22 years of experience.
When You Need Tub-to-Shower Conversion
Not every bathroom calls for this. But a handful of scenarios come up again and again in Westminster, and each one points to a conversion rather than a repair:
- A tub you can’t safely step into anymore. If a parent or a grandparent is negotiating a high tub wall every morning, a low-threshold shower with a proper seat and grab bar location removes the risk. We frame the safety problem first, then the layout.
- A cracked or leaking tub pan. A fiberglass tub that flexes underfoot or has a hairline crack around the drain is often past patching. In older Westminster homes near the Little Saigon edge of town, we regularly find tub surrounds that were caulked instead of waterproofed, and the substrate behind the tile is soft when we open it up.
- A tub nobody uses. In a two-bath house, the guest tub often becomes a storage shelf. Converting it to a walk-in shower turns dead square footage into the bath everyone actually uses.
- Hard water staining you can’t keep up with. Westminster’s water runs hard, and that shows up as mineral etch on tub surfaces and grout lines. A new shower with the right tile and a properly sealed pan is easier to keep clean than a re-caulked tub every few months.
- Accessibility for the long term. Aging-in-place planning is the most common reason we’re called for this work. A curbless design, a linear drain, and a folding seat can be built in from the start instead of retrofitted later.
- Mold that keeps coming back. Recurring mold at the tub-to-wall joint usually means water is getting behind the surround. That’s a waterproofing failure, not a cleaning problem, and it’s the kind of thing we open up and document before we quote the fix.

Our Tub-to-Shower Conversion Process
Here’s what actually happens, step by step, from the call through the final walkthrough:
- Written estimate on site. We measure the alcove, check the drain location and valve, and confirm what’s behind the wall where we can. You get a written price before any work starts, itemized by line, so the number doesn’t move when the truck shows up.
- Protection and demolition. Floors and surfaces get covered, the tub and surround come out, and we cut back to solid framing. This is where we find the real condition of the substrate and the rough-in behind the old tile or fiberglass.
- Rough-in and waterproofing. The drain gets relocated for the new shower, the valve is replaced, and the pan is built to slope correctly to the drain. We use a bonded waterproofing membrane over cement backerboard, taped and sealed at every seam and corner. This is the step homeowners never see and the one that decides whether a shower lasts.
- Tile and finish. Wall tile, floor tile, niche, seat, and trim go in after the waterproofing has set. We work to the layout you approved, and we grout and seal once everything is cured.
- Fixtures and glass. Shower head, valve trim, and glass or curtain hardware go on. We install Kohler and Moen fixtures, so the parts are traceable and manufacturer warranties back up our own.
- Close-out walkthrough. We clean the site, walk the job with you, and hand you the signed written guarantee. You’re left with a documented scope and a year of coverage behind it.
Tub-to-Shower Conversion Pricing in Westminster
Here’s what this work costs in Westminster, in line items you can compare against another quote. Every price is written down before work starts, and estimates are free.
| Scope | Typical Range |
|---|---|
| Standard alcove conversion (tub out, tiled shower in, same footprint) | $3,800 – $6,200 |
| Drain relocation and new shower valve | $500 – $1,100 |
| Curbless entry with linear drain | $900 – $2,000 |
| Built-in bench or niche | $350 – $850 |
| Glass enclosure and door hardware | $700 – $1,800 |
| Full job, mid-grade tile and fixtures | $3,800 – $9,500 |
What pushes a conversion toward the high end of that range: moving the drain more than a foot, going curbless, adding a bench, choosing large-format tile that needs a flatter substrate, or opening a wall to find rot or old plumbing. What keeps it low: keeping the existing valve and drain location, using a prefabricated shower pan instead of a custom-tiled one, and choosing standard-size tile. We tell you which category you’re in before the quote is written.
If your bathroom needs more than the shower done (new vanity, upgraded lighting, re-tiling the whole room), that work sits inside our Bathroom Remodeling in Westminster service and we can scope it together against one written price. Call (833) 954-5086 and we’ll come out and put a number in front of you.
What’s Behind the Wall Matters More Than the Tile
The part of a tub-to-shower conversion that decides whether it lasts ten years or three isn’t the tile you pick. It’s the waterproofing. A shower pan has to slope to the drain at the right pitch, and every seam where membrane meets wall or floor needs to be sealed correctly. When we open up an older Westminster bathroom and find tile glued straight to drywall with no membrane behind it, we know exactly why the mold kept returning.
This is why our process builds the pan and waterproofing as its own documented step, and why we photograph that stage before we cover it. You see what’s behind the tile before it goes on. It’s also why the 365-Day Done Right Promise is specific about coverage: if water gets where it shouldn’t within a year of our work, we come back and correct it at no charge. The guarantee is written into your file and handed to you at close.
On the materials side, we work from a documented roster of name-brand products. For this work that means Kohler and Moen fixtures, and tile installed on a substrate we build to the manufacturer’s spec. Traceable materials mean manufacturer warranties don’t get voided by generic installation, which is one more layer of protection on top of ours.
Why Bradford Remodeling Co Westminster for This Work
Bradford Remodeling is a member of the Garrison Partners family, established in 2004, and independently owned and operated here as Bradford Remodeling Co Westminster. Every location is held to The Garrison Standard: written pricing is non-negotiable, background-checked and uniformed technicians show up, and a live person answers the phone at any hour. No voicemail, no callback queue.
Our technicians have up to 22 years of experience in bathroom remodeling, and that shows up mostly in what we catch before it becomes a problem: a drain that needs relocating, a subfloor that’s soft, a valve that’s past its service life. We’d rather quote the honest number than quote low and find the issue mid-job. That’s the Garrison Code at work.
If you’re weighing a conversion against a full remodel, our home page covers how we scope projects overall. And when you’re ready, the number is (833) 954-5086.
FAQs – Tub-to-Shower Conversion
How much does a tub-to-shower conversion cost in Westminster?
A typical Westminster tub-to-shower conversion costs $3,800 to $9,500, including demolition, waterproofing, drain relocation, tile, and fixtures. Drain relocation, a curbless entry, and built-in benches add to that range. We put the price in writing before any work starts and come out for a free estimate. Call (833) 954-5086 to schedule one.
How long does a tub-to-shower conversion take?
Most conversions take three to six working days once materials are on site. The waterproofing step needs to cure before tile goes on, and that cure time is part of the schedule, not something we cut short. Jobs that uncover rot or need major plumbing changes can run longer, and we’ll tell you that before we start rather than after.
Can you convert my tub to a walk-in shower with a low or no curb?
Yes. A curbless walk-in shower with a linear drain is a common conversion for aging-in-place planning in Westminster, and it’s one of the most requested layouts we build. It does add cost for the drain relocation and the custom pan, but it’s built in from the start rather than retrofitted. We’ll show you the finished slope and drain location before tile goes down.
Is it cheaper to repair my tub or convert to a shower?
A tub repair like patching a crack or re-caulking runs a few hundred dollars, but it only helps if the tub itself is sound and nothing’s getting behind it. If the pan is cracked through, the surround isn’t waterproofed, or you’re dealing with recurring mold, a repair just delays the conversion. Call (833) 954-5086 and we’ll tell you straight which one your bathroom needs rather than selling you the bigger job.
Get a Written Price in Westminster
If you’re ready to trade the tub for a shower you can actually use, call (833) 954-5086 for a free estimate. A live person picks up around the clock. We’ll measure the alcove, tell you what’s behind the wall as far as we can see, and put a written price in your hands before any work begins. Every completion carries the 365-Day Done Right Promise, and every job closes clean with your signed guarantee in hand.
Written by the team at Bradford Remodeling Co Westminster, serving Westminster.


