







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
ES Windows Home Additions & ADU: The Westminster Owner’s Guide
Home additions and ADU (accessory dwelling unit) construction built around ES Windows products in Westminster typically run $45,000 – $130,000 for a home addition, with full ADU construction landing between $90,000 – $220,000 depending on size and site conditions. We’re an independent contractor, not affiliated with ES Windows, and we build additions and ADUs that integrate properly with the ES Windows units already in your home or specified for the new structure. Most Westminster owners start looking for help when an addition outlives its original permit footprint, when an ADU plan hits a setback snag with the city, or when the window package spec’d for a new structure no longer matches what ES Windows is currently producing.
Westminster sits in a coastal-influenced climate zone where marine layer humidity and Santa Ana wind cycles both stress exterior assemblies. Windows and framing that hold up fine inland can show premature seal failure or stucco cracking here within a decade if the installation wasn’t detailed for this specific microclimate.
Which ES Windows Models This Applies To

ES Windows builds a range of vinyl and aluminum-framed products, and the model line matters for additions and ADUs because the new structure’s window schedule has to match or consciously depart from what’s already installed. Older ES Windows units may use a specific frame depth and nailing fin configuration that newer series have changed. Before we spec a window package for an addition or ADU, we pull the label from an existing unit (usually inside the jamb or on the sash edge) and cross-reference the series. A mismatched frame depth in an ADU wall means the window sits proud or recessed incorrectly, which reads as sloppy work and can fail inspection.
The OEM-versus-aftermarket decision matters more here than on a single window swap. For an addition, we’re sourcing an entire window schedule, and sticking with the same ES Windows series keeps visual consistency and simplifies the rough opening dimensions. For an ADU that stands apart from the main house, there’s more room to specify a different series if it meets Title 24 energy requirements for the structure. We document which series we’re using and why, in writing, before framing starts.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your ES Windows Home Additions & ADU Is Failing
This isn’t a single part failing – it’s a building system showing stress. Here’s what we see on Westminster additions and ADUs:
- Stucco cracking around window perimeters. Usually a sign the window-to-wall flashing wasn’t detailed for moisture movement, letting water track behind the stucco and stress the substrate.
- Interior drywall cracks at window corners. Often points to header deflection or a rough opening that wasn’t sized to the window’s actual frame dimensions, so the assembly moves when it shouldn’t.
- Fogging or condensation between panes on ES Windows units. Seal failure in the insulated glass unit, common after 10-15 years in coastal humidity, and a signal the rest of the window assembly may be nearing replacement.
- ADU failing Title 24 or energy compliance at final inspection. Happens when the window U-factor and SHGC ratings on the installed units don’t match the permit documents – a paperwork and spec mismatch, not a defect.
- Water intrusion at the ADU roof-to-wall or window-to-wall junction. The most expensive failure to fix late; almost always a flashing and sequencing problem during original construction, not a window defect itself.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

For Westminster, a home addition runs $45,000 – $130,000 and an ADU runs $90,000 – $220,000; a garage conversion to living space is $30,000 – $80,000. The range is driven by square footage, foundation and site work, whether the ADU needs a separate utility meter, and the ES Windows package spec’d for the structure. We give you a written line-item price before any work starts – no numbers that move at the door.
Every completed addition and ADU carries the 365-Day Done Right Promise: if the work fails within a full year of completion, we come back and correct it at no charge. That covers workmanship, not product defects covered by the ES Windows manufacturer warranty, and we tell you plainly which is which in the written guarantee. Materials come from a documented roster, including Therma-Tru doors and James Hardie exterior products where specified.
DIY or Call Us?
There’s no safe DIY path for an addition or ADU. These are permitted structures with foundation, framing, electrical, plumbing, and Title 24 energy requirements, and unpermitted work creates a real liability when you sell or refinance. What you can safely do is check the existing ES Windows label on any unit you want matched, note the series and frame dimensions, and photograph your current window schedule. That speeds up our spec work.
Where DIY goes wrong: framing an opening to a “close enough” dimension for a window, then discovering the ES Windows unit won’t sit flush and the flashing can’t be done correctly. That’s a rebuild, not a fix. If you’re planning an addition or ADU in Westminster and want the window package spec’d right the first time, call (833) 954-5086 for a free estimate and a written scope.
FAQs

Expect 15-25 years for the sealed glass unit and 20-30 years for the frame assembly, with coastal humidity and marine layer exposure tending toward the shorter end of that range if flashing and drainage weren’t detailed well. Call (833) 954-5086 and we’ll assess the existing units before we spec a new schedule.
Sometimes – a failed insulated glass unit can often be swapped without replacing the whole window, while frame or flashing failures usually mean more involved work. It comes down to whether the frame and rough opening are sound. Call (833) 954-5086 for a free look before assuming you need a full replacement.
A home addition typically runs 3-6 months and an ADU 5-9 months depending on permits and site work, and windows are ordered early because lead times affect the framing and dry-in schedule. We sequence the ES Windows order against the build calendar so nothing sits exposed. Call (833) 954-5086 to talk through your timeline.
We specify the series that matches your existing ES Windows units or the ADU’s energy requirements, order through authorized channels, and document the model and specs in your written scope. We don’t carry parts on a truck – everything is ordered to the job. Call (833) 954-5086 to start with a free estimate.
Bradford Remodeling Co Westminster is an independent contractor and is not affiliated with ES Windows. We also work with KraftMaid, Cambria, and Silestone products across our remodeling work.
Ready to plan your Westminster addition or ADU with a written price and a window package spec’d correctly from the start? Call (833) 954-5086 for a free estimate – a live person answers, and we’ll put your scope and price in writing before any work begins. Every completed project carries the 365-Day Done Right Promise and is handled by background-checked, uniformed technicians.
Written by the team at Bradford Remodeling Co Westminster, serving Westminster and nearby areas.












